Infrastructure

I Area of land  allotted (in acres) : 33 Acrs
  Whether land transferred in the Name of Samiti : Yes
  Vidyalaya shifted to permanent buildings on : 01 July 2003
II Status of Boundary Wall
  a.  Brick Wall : Completed
  b.  Barbed wire fencing : -
III Permanent buildings constructed :  
IV School building : Complete
V Dormitories : Boys 08 complete Nos. with House Master Residence 08 Nos.
    : Girls 04 Nos. with House Mistress Residence 04Nos.
VI Kitchen/dining Hall : Complete
  No. of shifts required for all students  to take food : one shift
VII Principal Residence : 01 No.
VIII Staff Quarters : Type III = 24 Nos.
    : Type II = 06 Nos.
    : Type  I  = 06 Nos.
IX M.P. Hall : No.
X Workshop : No.
XI Type of O.H. Tank :  
  Its capacity :  
  Present Status :  
XII U.G. tank    
  Its capacity :  
  Present Status :  
XIII D.G. Set :  
    :  
    :  
    :  
    :  
XIV Sewage Pump :  
XV Water Pump :  
XVI Electrification    
  Electric connection : Rural
  Sub Station building   Complete
  Street lighting   100 Nos. of Poles
  Numbers of hrs. during day when power supply is available on an average.   18 hrs.
XVII Playfields    
  400 metre track   Available
  40 x 30 metre basket ball court   2 Nos.   – Available
  40 x 30 metre volley ball court   2 Nos  – Available
XVIII Water supply    
  Tube Well   Potable,  01 Nos.-  working
  Hand pump   Potable, 08 Nos.-  working
  Connection from PHED    
XIX Rajiv Gandhi Smriti Van   Available
XX Fire fighting arrangement   Working
XXI Last date of cleaning of    
 

Septic tank

   
  Water tanks    
XXII Whether area around transformer is fenced   Yes
XXIII Whether open wells, if any, are covered from top   No
XXIV Works taken up under M&R fund during current year and last year:-
  Year Name of work  (M&R)   Expenditure 
(Rs. In lacs)
Cumulative expenditure during the year
  2015-16 white washing & repairing work      
New Construction in Vidyalaya        
S.no
Name of construction
no. of construction
 
 
 
1.
Guard Post
 
 
 
 
2.
Vegetable Growing Project
 
 
 
 
 
 
 
 
 
 


 

Details of vehicle provided to the Vidyalaya

(i)

Whether vehicle is provided or not (Yes/No)

On Contract

(ii)

Description to vehicle.

Bolaro 

(iii)

Model no and date of purchase.

Nov. 2014

(iv)

Present condition of the Vehicle.

New & Good Condation